Carbon, labor, and cost challenges are tightly linked in data center design and construction. Embodied carbon from building materials is often overlooked, even though it can rival operational emissions. Growing regulations and increasing customer expectations are bringing this issue to the forefront. By prioritizing upfront engineering and leveraging offsite manufacturing, the industry can reduce labor needs, cut material use, and significantly lower embodied carbon.
With Rush Nathan, Business development director – Data centers.